Interconnection Guidelines

Holy Cross Energy offers incentives to members who install qualifying renewable generation at their homes or businesses. Eligible systems include those using solar, hydro, biomass, geothermal or wind energy to generate electricity. We will allow members who install generators up to 25kW to net meter the generation against the electric consumption at the same meter, with a load offset of up to 200%.

Any member interested in installing a generator behind their meter must complete and submit a Generator Interconnect Application and send via e-mail to renewables@holycross.com or by mail to:

Holy Cross Energy
Attn: Renewables
PO Box 2150
Glenwood Springs, CO 81601

Interconnection Resources
The following guidelines, application, policies and procedures apply to all generation resources including eligible renewable energy resources applying for connection to the Holy Cross Energy system.

Menu