Renewable Energy Rebates

Consumer-Sited Renewable Energy Generation within Holy Cross’s service territory

Effective with all new generator interconnection applications received on or after November 1, 2016, Holy Cross will require the addition of a production meter. Please review our new meter specs. When reviewing the meter specs, please note that with a self-contained production meter socket, a knife-blade style disconnect is now optional. The production meter shall be located within ten feet and in a line of sight of the utility meter.

Holy Cross Energy consumers that wish to add a production meter to their existing renewable generator may do so. An acceptable system one-line and site plan must be provided. The consumer is responsible for any and all costs incurred to modify their current system to accommodate for the production meter. Holy Cross will provide the production meter.

Holy Cross Energy offers incentives to consumers who install qualifying renewable generation at their homes or businesses. Eligible systems include those using solar, hydro, biomass, geothermal or wind energy to generate electricity. We will allow consumers who install generators up to 500 kW for photovoltaic systems or 50 kW for other systems to net meter the generation against the electric consumption at the same meter.

Any consumer who wishes to install a generator behind their meter must complete and submit a Generator Interconnect Application to via e-mail to renewables@holycross.com or via mail to:

Holy Cross Energy
Attn: Renewables
PO Box 2150
Glenwood Springs, CO 81601

Generator Interconnect Application (Click HERE)

A non-refundable interconnection study fee of $100 must accompany each interconnection application for systems with a nameplate capacity of 12-100 kW and $250 for systems with a nameplate capacity greater than 100 kW. The applicant may be responsible for additional study costs on a case by case basis, please review the information in Holy Cross’ Generator Interconnect Policy for additional information.

Net metering

Holy Cross will provide net metering service to consumers who install eligible generation behind their electric service meter. Under net metering, the meter will record net generation when the generator is producing more power than is being used on site and record net usage whenever consumption exceeds production. At the end of the billing month, Holy Cross will carry any excess generation forward to offset any net consumption on the next month’s bill. This will continue for 12 months, and any excess power delivered to Holy Cross will be purchased at the average cost of purchased power for the previous year as reported on the year-end RUS Form 7, Part K., which will vary on annual basis.

For residential consumers in 2016, the average effective rate for solar production is $0.100/kWh. This rate has increased on average 1.7% annually since 2005, as shown below. The average wholesale cost for 2016 is $0.0579/kWh.

Note: Average effective rate = Tariffed Energy Charge, per kWh, for Residential service plus average Electric Cost Adjustment Rate Rider.

Holy Cross will net meter photovoltaic generators up to 500 kW and other generators up to 50 kW. Generators must be designed to supply no more than 120% of the electrical consumption at a meter over the prior 12 billing months (at the time of application). If insufficient billing history exists, Holy Cross will estimate usage and specify a maximum allowable system size.

See the Renewable Energy Net Metering Service – Optional tariff sheet for further details on Holy Cross’ net metering program.

Interconnection Requirements

All generators designed to operate in parallel with the Holy Cross distribution system for any length of time must provide a Generator Interconnection Application prior to beginning construction. A Holy Cross engineer review and approval is required for interconnection for all generators. Information on Holy Cross’ requirements and evaluation process can be found at our Generator Interconnect Policy page.

Incentives

Incentives are available to Holy Cross Energy consumers who install renewable generation for net metering at their premises. Current incentive levels are shown below. Incentives may be denied to consumers who proceed with installation of their systems prior to receiving written approval of a Generator Interconnection Application from Holy Cross as described above.

Holy Cross will reserve incentives for 120 days starting on the day the Generator Interconnection Application is deemed complete. Any installations not completed (including all required documentation) before the reservation expires will lose their reservation. Any system that has forfeited their reservation may be eligible for an incentive payment based on the incentive program in effect at the time all requirements are met, subject to the availability of funds.

Payment of any incentive is contingent on the assignment of all rights, title and interest in and associated with all RECs, green attributes or environmental offsets produced by the system, including the right to use all RECs for compliance with the Colorado Renewable Energy Standard.

The following incentives are available for systems that meet all of Holy Cross’ program requirements on a first come, first-served basis.

0-6 kW $750/kW
6-12 kW $500/kW
12-25 kW $200/kW

For example, the incentive for a 15 kW system can be calculated as shown:

6 kW x $750/kW = $4,500
12-6 kW x $500/kW = $3,000
12-15 kW x $200/kW = $600
Total available: $8,100

For non-taxable entities, Holy Cross will provide an incentive equal to 40% of the installed cost of a system (on a $ per KW basis) up to $1,500/kW for the first 25 kW installed at a site. Any eligible consumer must include documentation of their non-profit status at the time of application and directly own the generator. Any generator for which available federal tax credits are monetized is eligible for incentives under the tiered structure discussed above.

For example, a 50 kW system owned by a non-taxable organization that cost $3,000/kW to install could expect a rebate of $30,000 (40% x $3,000/kW x 25 kW).

Systems installed for compliance with local or county program or code requirements, such as REMP or Eco-Build, or owned by third parties and leased to the Holy Cross consumer of record are not eligible to receive an incentive payment under the above structures. However, Holy Cross will offer a REC purchase price of $150/kW for the first 25 kW installed at a site. Any generation installed in excess of the applicable requirement may be eligible for incentives, please contact Holy Cross for further information.

Program rules & limitations

The following rules apply to all generation incentives:

  • Generation must be sized to supply no more than 120% of the account’s previous 12 months electrical consumption. For new construction, Holy Cross will estimate on-site electrical consumption and specify a maximum allowable system size.
  • No member may receive more than $50,000 related to the ownership of renewable generation.
  • Incentive payments will be reduced so that they do not exceed 40% of the installed cost of any project.
  • No rebates will be paid for any generation capacity in excess of 25 kW per account, including ownership of community solar generation.
  • Incentives are available on a first-come, first-served basis. No payment is guaranteed for any system that loses its incentive reservation
  • No incentive will be paid without a detailed cost accounting of the system cost, including for leased systems.
  • Holy Cross will not interconnect any system selling power to a consumer under a Power Purchase Agreement.
  • Consumers must be in good standing on all electric accounts at the date of application and continue to remain in good standing through the date that the payment is issued to be eligible for incentive payments. Good standing means no more than two disqualifying marks (late payments, disconnect for non-pay, etc.) on any electric account in the previous 12 billing months. Consumers will lose their eligibility to receive any incentive payment if they fall out of good standing with Holy Cross.
  • Consumer’s generation facilities must be connected to Holy Cross’s electric distribution system to qualify for incentives.

Incentive Funding

Incentives for renewable generation are funded through the WE CARE rider on each Holy Cross consumer's electric bill. Incentives will be funded at the current level unless a change in funding is announced.