General Services Load Form

Processing the application will not be possible until the required information is complete and is accompanied with the requirements of A and/or B below. Allow five (5) working days to process the application after receipt of all necessary information.


* Indicates a required field.

Owner must contact the Holy Cross Billing Dept. separately to establish a billing account before the connect request can be processed for each meter requested.

Service Type*

If you do not have a 911 address provided by the county/city please use TBD as the house number and include a street name.

Type of Service
Location: Within City Limits?
Will Natural Gas be Available to Development?
Nearby Holy Cross Asset
Secondary Voltage*
Amperage*
CTs Required?*
Photo Voltaic?
Secondary Wire Type*

PLEASE BE ADVISED
The Electrician or Contractor is responsible for providing adequate labor and equipment for the installation of the member owned service entrance cable between the HCE transformer and point of termination. HCE will provide a qualified employee to supervise the installation at the transformer location.

Please upload a sketch of the structure site including roads, driveways, sidewalks, fences, transformer location (overhead and underground) and proposed meter location(s) or provide site plan. Outdoor meters shall be installed in a location that is accessible at all times.

Back to Top